Tunneltrade – The tunnelling internet Portal
HomeCatalogNewsAdvertiseToolsTunnelling exhibitionInfolog in | myTunneltrade  
Searchresults sorted by 
offer new   Item online since: 08-06-2006 fixed price  4,98  €
Clamp fitting double drill clip with grommet 75 x 2" PN 10
Clamp fitting double drill clip with grommet 75 x 2 Clamp fitting double drill clip with grommet 75 x 2" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  5,00  €
Clamp fitting double drill clip with grommet 90 x 1/2" PN 10
Clamp fitting double drill clip with grommet 90 x 1/2 Clamp fitting double drill clip with grommet 90 x 1/2" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  5,06  €
Clamp fitting double drill clip with grommet 90 x 3/4" PN 10
Clamp fitting double drill clip with grommet 90 x 3/4 Clamp fitting double drill clip with grommet 90 x 3/4" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  5,13  €
Clamp fitting double drill clip with grommet 90 x 1" PN 10
Clamp fitting double drill clip with grommet 90 x 1 Clamp fitting double drill clip with grommet 90 x 1" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  5,21  €
Clamp fitting double drill clip with grommet 90 x 1 1/4" PN 10
Clamp fitting double drill clip with grommet 90 x 1 1/4 Clamp fitting double drill clip with grommet 90 x 1 1/4" PN 10 ...
more

 [9]  10  11  12  13  14  15  16  17  18  19  20  21  22  23 


World Tunnelling & Trenchless World
The new media force in underground construction.
http://www.mining-journal...

Tunnel
tunnel is a technical, practice-orientated trade journal dealing with research and planning issues of all subsurface constructions.
http://www.tunnel-online....

First-time curved drive in New Zealand hit the target with precision
"Perfect performance" stated Mike Harker, director of the New Zealand mining company HARKER UNDERGROUND CONSTRUCTIONS. "For the first time, a microtunnelling project in New Zealand has been planned as a curved drive and middle of April driven into the target."
read more...

New milling cutters for tunnelling
This year, a total of four new machines, the quick-snap-retaining ring for the fixing of round picks as well as a rotation module in three installation sizes for excavator of 15 - 50 t use weight will extend the product range of Erkan. Source: http://www.sbm-verlag.de/ bau Magazin, issue 05/06 downloads/Erkat.pdf Read more......
read more...

CargoCap is gathering way
CargoCap, the underground transport system for goods, is gathering way. For a period of 5 years, RWE Power AG makes parts of the disused machine house of the Bochum cogeneration plant gratuitously available to the chair of machine elements and conveyor technique.
read more...

Russia plans $65bn tunnel to America
110 km - World`s longest Tunnel
read more...


Advertisement | Terms & Conditions | Editorial Content | Contact | Sitemap