Tunneltrade – The tunnelling internet Portal
HomeCatalogNewsAdvertiseToolsTunnelling exhibitionInfolog in | myTunneltrade  
Searchresults sorted by 
offer new   Item online since: 09-06-2006 fixed price  8,16  €
PE 100 tube, black, length 6 m d 125 x 11.4
PE 100 tube, black, length 6 m d 125 x 11.4 PE 100 tube, black, length 6 m d 125 x 11.4 ...
more

offer new   Item online since: 09-06-2006 fixed price  10,16  €
PE 100 tube, black, length 6 m d 140 x 12.7
PE 100 tube, black, length 6 m d 140 x 12.7 PE 100 tube, black, length 6 m d 140 x 12.7 ...
more

offer new   Item online since: 08-06-2006 fixed price  1,85  €
Clamp fitting double drill clip with grommet 25 x 1/2" PN 10
Clamp fitting double drill clip with grommet 25 x 1/2 Clamp fitting double drill clip with grommet 25 x 1/2" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  1,94  €
Clamp fitting double drill clip with grommet 25 x 3/4" PN 10
Clamp fitting double drill clip with grommet 25 x 3/4 Clamp fitting double drill clip with grommet 25 x 3/4" PN 10 ...
more

offer new   Item online since: 08-06-2006 fixed price  2,30  €
Clamp fitting double drill clip with grommet 32 x 1/2" PN 10
Clamp fitting double drill clip with grommet 32 x 1/2 Clamp fitting double drill clip with grommet 32 x 1/2" PN 10 ...
more

 [4]  5  6  7  8  9  10  11  12  13  14  15  16  17  18 


Tunnel
tunnel is a technical, practice-orientated trade journal dealing with research and planning issues of all subsurface constructions.
http://www.tunnel-online....

Partnership tunneltrade / nodig-bau
The special internet portals nodig-bau.de and tunneltrade.com resolved upon a cooperation in partnership.
read more...

New milling cutters for tunnelling
This year, a total of four new machines, the quick-snap-retaining ring for the fixing of round picks as well as a rotation module in three installation sizes for excavator of 15 - 50 t use weight will extend the product range of Erkan. Source: http://www.sbm-verlag.de/ bau Magazin, issue 05/06 downloads/Erkat.pdf Read more......
read more...

CargoCap is gathering way
CargoCap, the underground transport system for goods, is gathering way. For a period of 5 years, RWE Power AG makes parts of the disused machine house of the Bochum cogeneration plant gratuitously available to the chair of machine elements and conveyor technique.
read more...

Tunnels & Tunnelling International
The leading monthly magazine for the tunnelling industry. Our website offers you the opportunity to view the latest issues online...
http://www.tunnelsonline....

Cooperation Tunneltrade.com / bau-portal.com
The international trade platforms of the construction industry, tunneltrade.com and bau-portal.com will cooperate in future.
http://www.bau-portal.com...


Advertisement | Terms & Conditions | Editorial Content | Contact | Sitemap