Tunneltrade – The tunnelling internet Portal
HomeCatalogAdvertiseToolsTunnelling exhibitionInfolog in | myTunneltrade  

offer   Item No. : 4981 Item online since: 10-03-2011 print page
Item Tunnel Bracket 14-TK2

Comment Reliable Joint Assembly

Location
Country
City Schwelm

Description
If tubbing segment joints - wether axial or radial - with a minimal width of 5 mm exist in the tunnel, any drilling at the installation is avoided. The assembly and horizontal adjustment at that application is done within less than a minute. This bracket can be also mounted to any other wall with the optional wall adapter.

The ingenious clamping-machanism allows use of heaviest surveying instruments and is tested in a tunnel with more than 80 Kilograms load by ourselves.

The well thought-out design allows the use in every situation. Whether at top, crown, bench or invert of tunnel profile you get your instrument to any location reliably mounted with this bracket.

The main advantages of this bracket again at a glance:

- Installation time under one minute
- No drilling for mounting required
- Very high loadability (in test > 80 kg)
- Assembly at each position in the tunnel
- With optional joint adapter also useable withoaut joints

Get in contactHere you can get in touch with the seller via the tunneltrade.com. Please fill in your contact details into the respective fields. The Seller will get a message with your contact details and will get in touch with you eather by email or by phone. Please do not forget to mention your country code. Please double check your email address that you typed in to avoid faulty insertions that may cause interferences in the contacting process.
First name, Last name
e-mail
Phone
Message
I agree to receive information from Tunneltrade in the future
 
Code:  
Tunnel Bracket 14-TK2
Tunnel Bracket 14-TK2 Tunnel Bracket 14-TK2 Tunnel Bracket 14-TK2 Tunnel Bracket 14-TK2 Tunnel Bracket 14-TK2
 
Download
 4981.pdf

The advertiser speaks the following languages:
 

Direct contact
Contact Mr. Goecke
Telephone +49 2336 4790-11
Service Links
 
> Currency exchange calculator
>Online translation support
>Forwarder
> Machine Certificate

Company links

Robbins TBM
Robbins Tunneling & Trenchless
Robbins TBM

Anton Feldhaus & Söhne
Heading by blasting, shotcrete works, tunnel remediation, slope and rock securing, backfilling of cavities...
www.feldhaus.com

Project Design Works
Charkowmetroprojekt offers project and design works for tunnel and metro projects and underground car parks.
Проектируйте с нами. Ваши идеи станут реальностью.

Welding of PE pipes
We weld polyethylene pipes in all sizes with modern equipment. We work fast and reliably!
www.anastasia-don.ru

Adapted Machine Tools
Production and delivery of adapted equipment for mining and tunnel excavation machines.
Ковши для горно-шахтной и строительной техники


Advertisement | Terms & Conditions | Editorial Content | Contact | Sitemap