Tunneltrade – The tunnelling internet Portal
HomeCatalogNewsAdvertiseToolsTunnelling exhibitionInfolog in | myTunneltrade  

offer used   Item No. : 430 Item online since: 28-10-2005 print page
Item Double girder gantry crane

Comment
Manufacturer BRUNNHUBER
Model designation
Year of manufacture 1999
Condition in a very good condition - nearly unused
Price on request 

Location
Country Germany
City D-45356 Essen

Description
capacity approx. 30,0 t
span approx. 20,0 m
hook path each max. approx. 110,0 m
make BRUNNHUBER
year 1999/2000
operating time approx. 1 year

Crane equipped with :
- separate end pieces for each main support for an optimum wheel load distribution
- gangway on one side for electric as well as maintenance platform for trolley driving gear
- cabin control as well as radio-remote control
- current supply to the trolley through energy circuit
- device for tandem operation as well as collision security device
- frequency regulator infinitely variable for hoist gear, trolley gear and crane travel gear

Working speeds:
hoist gear up to 15 t approx. 6 – 120,0 m/min
up to 30 t approx. 6 – 60,0 m/min
trolley gear approx. 3 – 40,0 m/min
crane travel gear approx. 5 – 80,0 m/min

Get in contactHere you can get in touch with the seller via the tunneltrade.com. Please fill in your contact details into the respective fields. The Seller will get a message with your contact details and will get in touch with you eather by email or by phone. Please do not forget to mention your country code. Please double check your email address that you typed in to avoid faulty insertions that may cause interferences in the contacting process.
First name, Last name
e-mail
Phone
Message
Double girder gantry crane
Double girder gantry crane
 
The advertiser speaks the following languages:
  

Direct contact
Contact Ralf Teichmann GmbH, Am Stadthafen 40
Telephone + 49 (0) 201-83455-0
Telefax + 49 (0) 201-333020
Service Links
 
> Currency exchange calculator
>Online translation support
>Forwarder
> Machine Certificate


Trenchless Platform
The trenchless news platform for the the trenchless technology industry.
http://www.nodig.de...

World Tunnelling & Trenchless World
The new media force in underground construction.
http://www.mining-journal...

bi Umwelt Bau
Umweltbau is published 6 times a year and is one of the leading magazines for all kind of sewer construction and trenchless technologies.
http://www.bi-online.de/...

Cooperation of RUSTUNNEL and TUNNELTRADE
The Internet portal www.rustunnel.ru and tunneltrade.com will cooperate in future to take optimal advantage of common synergies.
read more...

First-time curved drive in New Zealand hit the target with precision
"Perfect performance" stated Mike Harker, director of the New Zealand mining company HARKER UNDERGROUND CONSTRUCTIONS. "For the first time, a microtunnelling project in New Zealand has been planned as a curved drive and middle of April driven into the target."
read more...

Russia plans $65bn tunnel to America
110 km - World`s longest Tunnel
read more...


Advertisement | Terms & Conditions | Editorial Content | Contact | Sitemap