|
|
|
|
|
The ITE AutoFlock 3000 flocculation unit is installed in a 20ft standard container and is a modular compact system for treating and applying polymer solutions. Due to the integrated control ...
|
|

offer |
new |
|
 |
15-01-2010 |
on request
|
|
|
|
|
Due to the application of flocculant aids the fine particles of the supplied solid-liquid mixture coagulate and result in macroflakes which settle in the tapered section of the VC2500. The ...
|
|

offer |
new |
|
 |
07-01-2010 |
on request
|
|
|
|
|
Completed Project: more
Production Date: on April 27, 2009
Construction Unit: Sinohydro Engineering Bureau 7
Production Description: ø3.85m, L=7.5m+7.5m circular Needle beam hydraulic formwork carriage
Main Parameters:
Lining length: 15000mm
Overall size: ...
|
|

offer |
new |
|
 |
07-01-2010 |
on request
|
|
|
|
|
The ITE MINI 4HDD separation plant is specially designed for HDD drilling applications and dewatering of slurries up to 50 m³/h.
Due to the small dimensions, the ITE MINI 4HDD separation ...
|
|

offer |
used |
|
 |
07-01-2010 |
on request
|
|
|
|
|
This recent model Sandvik ATM105 heavy roadheader is being offered for sale on the international market by NDCO.
We can provide assistance in preparing this machine for shipment, as well as ...
|
|

|

Company links
AuTeG Automatisierungstechnik - planning, implementing and building electronic components for Tunnel Boring Machines. more...
The way is the aim ... The efficient TBM and roadheader machines for the tunnelling and mining industry from MERAN OHG. www.meran-vtt.de
Streif Baulogistik Logistics, Consulting & Management www.streif-baulogistik.de
Load & Transport Machines We supply load and transport machines for mining and tunnelling works. www.ammining.ru
SPT Diving Pumps We sell and rent out high-quality diving pumps for the construction and industrial area from 0.25 to 65 kW. www.SPT-Pumpen.de
Here your advert could appeare soon!
|