|
|
|
|
|
Pillar plates from GOECKE have a 30 year proven track record of outstanding performance on challenging construction sites, in tunnels, bridges and civil engineering structures.
They assure the highest accuracy for ...
|
|

|
|
|
|
|
If tubbing segment joints - wether axial or radial - with a minimal width of 5 mm exist in the tunnel, any drilling at the installation is avoided. The assembly ...
|
|

|
|
|
|
|
Our universal wall bracket is mainly based on the 14-TK2 bracket. This bracket is even more flexible as there are no joints necessary for mounting. The main advantages of the ...
|
|

offer |
new |
|
 |
10-03-2011 |
on request
|
|
|
|
|
These monitoring prisms are specially designed for the application on the ground. The 17mm mini prism is glued into the solid aluminium body with a vertical inclination of approximately 20°.
Due ...
|
|

offer |
used |
|
 |
05-03-2011 |
on request
|
|
|
|
|
ITC 312, YEAR 2001, IN EXCELENT CONDITION AND READY TO WORK, THE MACHINE IS IN THE CZECH REPUBLIC. ...
|
|

|

Company links
Robbins TBM Robbins Tunneling & Trenchless Robbins TBM
CIFA Tunnel formwork Top quality equipment. Self-reacting, self-supporting, self-launching, telescopic "Full round", underground ducts. www.cifa.com
tacs TBM Guidance System The acs Guidance System for TBM positioning and segment calculations. www.tacs.de
Ceresola TLS Tunnel Lining Systems - Your center of excellence for tunnel lining systems. Steel support systems, formworks... www.ceresola.com
Centrifuge We are a global leader in centrifuge design and manufacturing centrifuges
Here your advert could appeare soon!
|