offer |
used |
|
 |
04-10-2011 |
on request
|
|
|
|
|
A TBM Robbins, whose use is ended after completion of the Manski tunnel in October 2011, stands for sale.
Technical data:
- Outer diameter: 4.3 m,
- Installed performance: 1260 ...
|
|

offer |
new |
|
 |
19-09-2011 |
on request
|
|
|
|
|
1. Powerful Cutting Capacity
Adopt the cutter head manufactured by international top-grade technology, which has characteristics as large force of designed single cutter, reasonable layout of cutting teeth and powerful ...
|
|

offer |
used |
|
 |
26-07-2011 |
on request
|
|
|
|
|
This Robbins Open Gripper Main Beam TBM was "rebuilt" in 2008 by Robbins to drive a 4,800 mtr mine drainage tunnel in Paua New Guinea and was supplied with a ...
|
|

offer |
used |
|
 |
21-04-2011 |
on request
|
|
|
|
|
The TBM Atlas Copco Jarva MK12 was under the leadership of Robbins fully refurbished.
After the refurbishment, the JV ATUS used the TBM for one drive of 1800m length.
Technical data :
• ...
|
|

offer |
used |
|
 |
24-03-2011 |
on request
|
|
|
|
|
The Robbins TBM was built 2003 for the Karahnjukar Project in Iceland and completely refurbished in 2007 for the Sigirino Tunnel in Switzerland (2'300 m length). For this tunnel the ...
|
|

|

Company links
Vertical Tunnelling SIREX Pulse Hydraulic. Vertical tunnelling machines with highest efficiency for geothermic power stations. www.geo-kraftwerk.eu
AuTeG Automatisierungstechnik - planning, implementing and building electronic components for Tunnel Boring Machines. more...
Here your advert could appeare soon!
|