|
Comment |
Reliable Joint Assembly |
|

Location |
|
Country |
Germany |
|
City |
Schwelm |
|

Description |
If tubbing segment joints - wether axial or radial - with a minimal width of 5 mm exist in the tunnel, any drilling at the installation is avoided. The assembly and horizontal adjustment at that application is done within less than a minute. This bracket can be also mounted to any other wall with the optional wall adapter.
The ingenious clamping-machanism allows use of heaviest surveying instruments and is tested in a tunnel with more than 80 Kilograms load by ourselves.
The well thought-out design allows the use in every situation. Whether at top, crown, bench or invert of tunnel profile you get your instrument to any location reliably mounted with this bracket.
The main advantages of this bracket again at a glance:
- Installation time under one minute
- No drilling for mounting required
- Very high loadability (in test > 80 kg)
- Assembly at each position in the tunnel
- With optional joint adapter also useable withoaut joints |
|

Get in contact |
|
|
|
|
|
 |
The advertiser speaks the following languages: |
|
Direct contact |
| Contact |
Mr. Goecke |
|
Phone |
+49 2336 4790-11 |
|
|
Service Links |
|
|
|
|