offer |
used |
|
Item No. :
431 |
 |
28-10-2005 |
 |
|
 |
Item |
Double girder gantry crane |
|

|
Comment |
in steel box construction |
|
Manufacturer |
TAKRAF/TEICHMANN |
|
Model designation |
|
|
Year of manufacture |
2001 |
|
Condition |
in a very good condition |
|
Price |
on request
|
|

Location |
|
Country |
Germany |
|
City |
D-45356 Essen |
|

Description |
capacity approx. 40,0 t
span presently/can be extended with to approx. 20,0/25,0 m
lifting height above earth approx. 13,5 m
hook path under earth approx. 25,0 m
total hook path (in case of reduction of lifting height top of rail) approx. 38,5 m
make/modification TAKRAF/TEICHMANN
modification/new erection 2001/2002
crane equipped with stable trolley with double drum hoist gear with rope distance approx. 6,0 m to stabilize a hook girder, cabin control as well as in supplement possibility of radio-remote control
Working speeds:
hoist gear full load/partial
load up to approx. 10,0/20,0 m/min
trolley gear up to approx. 40,0 m/min
crane travel gear up to approx. 50,0 m/min
|
|

Get in contact |
|
|
|
|
|
 |
The advertiser speaks the following languages: |
|
Direct contact |
| Contact |
Ralf Teichmann GmbH, Am Stadthafen 40 |
|
Telephone |
+ 49 (0) 201-83455-0 |
|
Telefax |
+ 49 (0) 201-333020 |
|
|
Service Links |
|
|
|
|
|

Company links
BRANDT Solids Control New innovative separation technology for microtunneling applications from the US www.separation.de
The World of ATLAS COPCO A world leader in compressors, generators, construction and mining equipment, assembly systems and industrial tools www.atlascopco.com
GEODATA Leoben / Austria Geotechnical monitoring and surveying worldwide. GEODATA - we turn data into information. more...
NAUE Sealing GmbH Waterproofing for Tunnels. Geosynthetics are commonly used for drainage, sealing as well as protection. www.naue.com
Glass fibre tubes corrosion constant, high-quality for water pipes, aggressive liquids, sewage systems Contact by phone +7 927 4151766
Here your advert could appeare soon! |