want |
|
|
Item No. :
3469 |
 |
17-12-2006 |
 |
|
 |
Item |
Microtunnelling Operator/Engineer/Manager |
|

|
Comment |
for new challenges world wide |
|

Location |
|
Country |
Australia |
|
City |
Brisbane |
|

Description |
KOSHY THADATHIVILA VARGHESE.
Present address E-Mail Address
P.O.Box. 396 ktv100@hotmail.com
Welsh pool ,WA 6986, ktv100t@yahoo.com
Australia
Tel. 0061(0)416957994 (mobile).
0061423008175
00914742522373
00919847522279
PERSONEL INFORMATION.
Date of Birth : 30th May 1972, (34 years).
Nationality : Indian.
Marital Status : Married.
Passport Details : Valid up to 24th May 2016.
Languages Known : English, Arabic, Hindi, Tamil and Malayalam.
EDUCATIONAL QUALIFICATION.
Degree in Mechanical Engineering, (B.Tech)
From KERALA UNIVERSITY, India.
Diploma in Mechanical Engineering
From Board of technical education, Kerala.
OTHER QUALIFICATION.
Production Management
Completed from Annamalai University Distant Education System.
Working knowledge in Auto Cad, Microsoft Word, Excel and use of INTERNET etc.
Kuwait Driving License Valid up to 2007.
Inter national Driving License valid up to 2007.
Australian licence valid upto 2011
WORK EXPERIENCE
Work Experience in brief (Approx. 13 years) is given below
November 2006-till date :Working as a Tunnel operator with
M/s Rob Carr Pty Ltd,Western Australia
June 2006 to November 2006 : Working as Tunnel Engineer with M/s Al Muhaidib
Contracting Company, Saudi Arabia
March 2003 to May 2006 : Working as Microtunnelling operator in
M/s Mushrif Company Ltd, Kuwait.
November 2002 to March 2003 : Worked as Microtunnelling Engineer in
M/s House of trade contracting company, Kuwait.
August 1995 to November 2002 : Worked in Microtunnelling section with
M/s United Gulf Construction Co.W.L.L, Kuwait
As a Microtunnelling operator.
November 1993 to July 1995 : Worked as an Inspection Engineer in
M/s. Flow tech Industries LTD, Bombay, India.
NATURE OF WORKS IN DETAIL
In the microtunnelling field worked in different machines, I was involved to do 100 KM in various ground conditions in different diameters of steel, concrete, polycrete, clay and GRP pipes.
M/s Robcarr Pty Ltd,Australia
Working the operator of ISEKI and SOLTAU tunneeling machines,recording the day to day activites,Coordinating with the clients etc..
M/s Al Muhaidib Contracting Company, Saudi Arabia.
As a team leader of the microtunnelling division, I am leading the all team of dewatering, Microtunnelling, Inspection team. Main functions are coordinate with consultant, ministry for permits, keep the quality, bill payments,Inspectin of work site, execution as per the specification, alterations if necessary, meet the target of production and administerial problem solving with the employees, work schedule as per programme etc. I am leading the operational team of AVN 800, AVN 2000 and MTS 800. Also coordinating the different problems usually facing in the tunneling operations. Decision making as per the situations. Arranging the pipes, materials, and manpower. Giving opportunity for new faces in this field, giving training and making professionals for future. Also handling the petty cash and monitoring the expenses and activities in the site without affecting the production. MTS machine working with TACS steering system and Herrenknecht machine working with UNS guiding system. I had got a good opportunity to learn these said guiding systems how is working during operation.
M/s Mushrif Trading and Contracting, W.l.l
In the microtunnelling section of Mushrif Company is a specialty division included piling, dewatering, CCTV, I was involved to managing the site requirements and supervising the operation and maintenance of the latest edition of the tunneling machine diameter of AVN400mm up sizing AVN500mm, AVN600mm,
AVN800mm up sizing AVN1000mm, AVN1200mm up sizing AVN1400mm and AVN1600mm from Herrenknecht, Germany. As well as operating and managing the pipe jacking machine MH-2 from Herrenknecht diameter of 1200mm, 1600mm, 2000mm.Executing the site activities like jack setting, laser fixing, flange fixing, concreting back side of the jack rig, making the complete set up for another operation and coordinating with the ministries, arranging the materials from the local market, make planning for the equipments and mobilization of the units after the operations. Ordering the pipes as per schedule, planning the operation schedule. Arranging the manpower and give training for the crews about the tunnel jobs and safety constructions. Keeping the safety measures and good house keeping of the materials and machines, mobilizing the machine and materials in full safety, keeping the drive records and daily report for future reference, making advance plans for the requirement of equipments without any delay of production. Arranging the cleaning and further activities after the operation in completed tunnels. Making planning for preventive maintenance before the next operations.
Sewerage Inspection.
I am leading the team of sewerage inspection of the sanitary and the storm water supplies using the method of CCTV of Hytech, France. Inter acting with the ministry officials and making bill of quantity after the work for the payment. Arranging the equipments and managing the team. Also helping the team of dewatering with well point methods and using auger machine of 7m length drill and raiser pipes, Header pipes, Perrot type materials and Hudig pumps for excavation. Helping the team of Sheet piling and the bore piling.
M/s House of Trade and Contracting W.l.l, Kuwait.
In the microtunnelling section of House of Trade Company, leading and operating the team of tunneling with SOLTAU, Germany diameter of 600mm and 700mm.Making planning for the production and arranging the equipments, accessories using for tunneling process. Laisoning with the ministries and the consultants, operating the job with international standards and safety procedures. Scheduling the work as per the priority and maintaining the machineries with preventive manner.
M/s United Gulf Construction Company, Kuwait.
In the microtunnelling section of UGCC, working in the operation and maintenance of tunneling machines
Like SOLTAU, GERMENY with different diameters such as 500mm to 1200mm and ISEKI, JAPAN diameters of TCC350, and TCC500.The entire machine working with latest computerized and hydraulic systems. Also repairing all types of water pumps, valves, lubrication systems, compressors, overhead cranes, welding machines and blower fans etc....Help the team of mechanic to up size the shields.
Making plans and maintaining records of the preventive maintenance system to increase the production. Evaluating the timing costs and making reports for the insurances claim.
In the CCTV section operating the camera and making records with the ministry inspectors, Repairing the camera and electrical accessories in the operating van from IBAK-KIEL, GERMANY.
In the Material department my responsibilities extend to sending inquiries for spare parts, consumable materials using in the work site from different origins, collecting quotations, technical and commercial negotiations and prepare work orders of the product as required. Inspections of the materials, vendor works, receiving materials at warehouse and issuing upon request.
Following are some of the projects of the Ministry of Public works, Kuwait I have been associated with.
Project No.SE/1/1993-’94,
Sanitary Sewer Renovation Project, Phase V, Part A, Sulaibhikat.
Project No. SE/130/1994-’94,
Sanitary Sewer Renovation Phase II, Part C
Daiya and Shaab.
Project No.SE/18/1996-“97
Sanitary Sewer Renovation Phase III, Part A
Kuwait City and Shuwaikh residential Area.
Project No. SE/29/1999-‘00
Sanitary sewer Renovation Phase II, Part B
Shuwaikh Industrial Area and Quortuba.
Project No.SE/32/2000-2003
Sanitary sewer renovation Phase III,
Rumaithiya.
Project No.SE59/20001-2002
Sanitary renovation of Rabya.
Project No.SE/67/2002-2004
Infra structure of housing, Jaleeb surra area.
Project No. RA /59/01-03
Water supplies and Irrigation project, Abdaly.
Project No.C4/02-04
Drinking water line project, Mutla to Airport.
Project No.SE/46/03-04
Sanitary renovation for Salwa area.
Project No. RA/97/04-05
Culvert project North Doha Area.
Project No.340/99-01
NHA housing Infra structure, Jahra.
Project No.C-11 and C-12, Sanitary Drainage of Jeddah,
Saudi Arabia.
Project No CAL 009,CALOUNDRA,Queensland,Australia
From November 1993 to July 1995
As an Inspection Engineer, control the quality of the pipe fitting products for the government projects, Co-ordination of the inspection department and the external inspection agency, execution and scheduling the inspection department on priority. X-ray testing and high precision measuring instruments was in use for such inspection purposes. The maintenance department activities were also carried out at the same time.
I have been associated with the commissioning of chemical plant BECL, Shajahanpur, and UP, INDIA in 1995.
|
|

Get in contact |
|
|
|
|
|
 |
The advertiser speaks the following languages: |
|
Direct contact |
| Contact |
KOSHY VARGHESE |
|
Telephone |
0061423008175 |
|
Mobile |
0061416957994 |
|
|
Service Links |
|
|
|
|
|

Company links
Surveying - pipe jacking Accuracy combined with maximum efficiency. Surveying and surveying systems at first hand! www.vmt-gmbh.de
ANTRAQUIP - Roadheaders and Tunnel Support Systems. Your leading supplier for tunneling equipment - experienced, innovative & reliable. www.antraquip.info
Roadheaders & more... Alpine is a full service provider of excavator-mounted cutter heads, cutter-buckets and new and used roadheaders. ALPINE Sales & Rental Corp.
Vertical Tunnelling SIREX Pulse Hydraulic. Vertical tunnelling machines with highest efficiency for geothermic power stations. www.geo-kraftwerk.eu
Diving and rescue works "Levitating a SEA" - we carry out rescue and diving works worldwide.
Email: divet1714@rambler.ru
Here your advert could appeare soon! |