offer |
rent |
|
Item No. :
1145 |
 |
28-12-2005 |
 |
|
 |
Item |
Containerized Hyperbaric- and Diver Treatment Chamber |
|

|
Comment |
Haux Life Support Starmed 2000 |
|
Manufacturer |
|
|
Model designation |
|
|
Year of manufacture |
2002 |
|
Condition |
|
|
Price |
|
|

Location |
|
Country |
Germany |
|
City |
Ammersbeck |
|

Terms of payment |
|
|

Description |
Containerized Hyperbaric- and Diver Treatment Chamber
with Spray Fog Fire Fighting System
Max. Design Pressure 5,5 bar
Max. Working Pressure 5,0 bar
Max. Test Pressure 8,25 bar
Main Chamber Capacity 3 seating or 2 lying persons
Ante Chamber Capacity 2 seating persons
Chamber Diameter 2000 mm
Length of Main Chamber 2200 mm
Length of Ante Chamber 1000 mm
Length over all,
incl. control panel approx. 4000 mm
Width over all approx. 2020 mm
Height over all,
incl. illumination units 2145 mm
Main Chamber Volume 6.800 l
Amte Chamber Volume 3.100 l
Material Mild Boiler Steel H II
Number of Doors 3 pieces
Rectangular Door (MC-direct access)
1500 mm x 600 mm
Circular Door, free diameter (AC-direct / MC-AC)
700 mm
Number of Windows in MC
(Wall MC/AC and AC/MC door) 3
Window Free Diameter (cylinder wall + doors)
200 mm
Supply Lock (MC-control-panel-side) 1
free diameter 200 mm
free length 300 mm
volume approx. 9 l
NATO/STANAG/DIN-Bayonet-Flange (female) for connection of Rescue Chamber
1 arranged at AC-access
Electrical Connection 230/400 Volt 50 Hz
Electrical Consumption approx. 4000 Watt
Certification German Lloyd
Weight, chamber complete equipped
approx. 14.500 kg |
|

Get in contact |
|
|
|
|
|
 |
The advertiser speaks the following languages: |
|
Direct contact |
| Contact |
Nordseetaucher GmbH |
|
Telephone |
+49 4102 23180 |
|
Telefax |
+49 4102 231820 |
|
Mobile |
+49 172 4300598 |
|
|
Service Links |
|
|
|
|
|

Company links
Leak water lines Studies for leak water lines in traffic tunnels. Special know how available due to long term experience. www.mta-messtechnik.at
PANDA - Net Adjustment Special software solution for basic geodetic survey network adjustments in tunnelling. Worldwide references. more...
RAUH Betonschalungen AG Design, development and manufacturing of special formworks for tunnel construction and tunnel portals www.rauh.ch
VMT Guidance System SLS Highest precision with the TBM Guidance System SLS for pipe jacking navigation in straight or curved drives. www.vmt-gmbh.de
Cast iron segments and parts for tunnel and metro lining works. www.shahtkomplekt.ru
Here your advert could appeare soon!
|