Tunneltrade – The tunnelling internet Portal
HomeCatalogNewsAdvertiseToolsTunnelling exhibitionInfolog in | myTunneltrade  
Click here to go to Macromedia download page.
The one-stop source for the tunnelling industry
NATM, Drill and Blast TBM Segmental tunnelling Microtunneling, Pipe jacking
Top Offers

TBM  TUNNEL BORING MACHINE, EBP TYPE 6.44 M
TBM TUNNEL BORING MACHINE, EBP TYPE 6.44 M
2005 MITSUBISHI EPB TBM (TUNNEL BORING MACHINE). MACHINE WAS USED FOR LESS THAN 10,000 FEET! THE CUTTER FACE IS SUITABLE FOR BOTH TEETH AND DISC CUTTERS. SPARE PARTS ARE AVAILABLE. MORE INFO WILL BE ADDED SOON, IF INTERESTED PLEASE GIVE US A CALL.
More information >>
TBM EPB Machine 3730
TBM EPB Machine 3730
EPB TBM 3730 with Cutting diameter 3600 mm for the constuction of sewage tunnels
More information >>
TBM Robbins diameter=3,5 m
TBM Robbins diameter=3,5 m
TBM used incl. backup, rolling stock, rotary dumb unit and locomotives
More information >>
Used Schoema Locomotives available
Used Schoema Locomotives available
High quality refurbished Schoema Locomotives available
More information >>
 
 
New Offers

Shotcrete Machines
Shotcrete Machines
We are producer of Shotcrete,Refractory pumping ,Mixing machine and Etc..and also We produce spare parts of those machine not only for our machine but also We produce Spare parts of Aliva,Meyco,Intradym,Putz-m and etc.. if you need anykinds of those machine or Spare parts of those machine pls Contact with us. Lasparsan Kaucuk san tic
More information  >>
Looking for TBM OD 5,6 m
Looking for TBM OD 5,6 m
For a Metro tunnel construction site in Donezk, Ukraine we are looking for a TBM with outer diameter of 5.6 m for hard rock and mixed grounds in good condition, new or second-hand. Purchase or rent Contact: Phone/Fax: +38 062 348-44-23 Mobile: +38 050 262-90-09 E-mail: bondarenko@altcom.ua Bondarenko Andrey
More information  >>
Skilled Worker Wet Shotcreting
Skilled Worker Wet Shotcreting
We are looking for our Swiss customer for an employee who has professional experience in the field of wet shotcrete spraying and is able to operate a shotcrete robot machine. He also should be able to drive a tyre loader. Project duration for a longer time with the possibility of fix employment. Project in western Switzerland Rate per hour: approx. 40 Swiss francs / gross as well as expenses, tunnel and shift bonus
More information  >>
Looking for Skilled Tunnel Personal
Looking for Skilled Tunnel Personal
Requirements: Wall and ceiling formworks Concreting, concrete cosmetics Shotcrete works and surface protection overcoatings Sewage works like shafts and setting pipes Excavation works like changing drilling tools, drill & blast, service works in tunnel Operating of wheel loader and/or chain excavator and/or vault shutter. You are flexible and reliable You are 22 to 50 years old Have the driver's licence and are mobile (with vehicle) Please send written applications only as a lot paper collection without briefcases and covers. This makes the handling easier for us and saves you costs since we do not send the documents back
More information  >>
TBM Robbins diameter=3,5 m
TBM Robbins diameter=3,5 m
TBM used incl. backup, rolling stock, rotary dumb unit and locomotives
More information  >>
Contracts Management, Project Management
Contracts Management, Project Management
Contracts Management, Claim-Management, Expert Reports. German VOB, FIDIC, NEC forms of contract. In Europe and Overseas.
More information  >>

Adverts from the field machines and equipment
more >>
Adverts from the field material and tools more >>
Adverts from the field Services more >>
Adverts from the field employment more >>
Constructors more >>

World Tunnelling & Trenchless World
The new media force in underground construction.
http://www.world-tunnelli...

GSTT Consulting Service
Masterminds for the underground. Underground constructions, statics, tunnelling, selection of material, corrosion, surveying, risk and damage analysis, contracts, specific information systems.
http://www.gstt.de/index....

A Look At The North Shore Connector Project
PITTSBURGH It’s one of the most controversial and expensive construction projects in our region’s history.
read more...

GEO: Tunnelling, a 57 kilometre journey through rock
After its completion in 2015, the St. Gotthard Tunnel in Switzerland will be the longest tunnel in the world. This crazy project poses a challenge to the art of engineering
read more...

Nodig Book shop on the Internet
The Book Shop is focussing on civil engineering companies, network operators, private or public utility, cable installation contractors, planning or engineering offices or guild or association who are looking for up-todate literature.
read more...

EFNARC Publications
Download Specifications and Guidelines for Sprayed concrete and special products for Mechanised Tunnelling (TBM)
http://www.efnarc.org/pub...

Robbins
Herrenknecht
CIFA
Atlas Copco

Advertisement | Terms & Conditions | Editorial Content | Contact | Sitemap